Building Glossary
The terms that appear on quotes, drawings and schedules of works, explained in plain English.
Structure and groundwork
These are the terms that appear on structural drawings and engineers calculations, and the ones that carry the most cost if they are misunderstood.
- RSJ: rolled steel joist, the beam that carries the load when a loadbearing wall is removed. Sized and certified by a structural engineer.
- Padstone: a dense concrete block set into the wall beneath the end of a steel to spread its load. Omitting one is a common and serious defect.
- Underpinning: deepening or strengthening existing foundations, usually because they are inadequate for a new load or because of subsidence.
- Trimming: framing an opening in a floor or roof so that the cut joists or rafters transfer their load onto the neighbouring ones.
- Lintel: the beam over a window or door opening that carries the masonry above it.
- Purlin: a horizontal beam running along the roof slope that supports the rafters at mid span.
Extensions and layout
The vocabulary of the projects that dominate south west London.
- Side return: the strip of land beside the back addition on a Victorian terrace. Filling it in widens the kitchen and is the highest value alteration on most terraces here.
- Back addition: the narrower rear wing running down one side of the plot on a Victorian terrace, usually containing the original kitchen and scullery.
- Wrap around: an extension combining the rear and the side return, taking the full width of the plot.
- Hip to gable: converting a sloping hipped roof end into a vertical gable wall, squaring the roof to create loft volume.
- Dormer: a structure projecting from the roof slope with a flat roof and vertical face, creating full head height in a loft.
- Mansard: a roof reshaped to a steep near vertical pitch with a shallow top, giving the greatest loft volume but almost always needing full planning permission.
Consent and regulation
The approvals that determine whether a project can proceed, and in what form.
- Permitted development: alterations you may carry out without a planning application, within defined limits. Removed in some conservation areas and never available to flats.
- Prior approval: a notification process for larger single storey rear extensions, where the council consults neighbours but does not assess the design in full.
- Article 4 direction: a council order withdrawing permitted development rights in a defined area, meaning a planning application is required for work that would otherwise be automatic.
- Building regulations: the technical standards covering structure, fire, insulation, ventilation and electrical safety. Separate from planning permission and required in addition to it.
- Listed building consent: a separate consent needed for almost any alteration to a listed building, including interior features. Working without it is a criminal offence.
- Party Wall Award: the document produced by surveyors when a neighbour dissents to a party wall notice, setting out how the works may proceed and recording the condition of their property.
Trades and stages
The sequence terms that appear on a schedule of works and in progress reporting.
- First fix: the services work carried out before plastering, when cables, pipes and duct runs are installed inside the structure.
- Second fix: the visible fittings installed after plastering and decoration, including sockets, switches, taps, sanitaryware and door furniture.
- Strip out: the removal of existing finishes, fittings and services back to the structure before new work begins.
- Snagging: the process of identifying and correcting minor defects at the end of a project before final handover and payment.
- Schedule of works: the written document setting out every item to be carried out, in sequence, with the cost of each. It is what a quotation should be based on.
- Variation: an agreed change to the schedule of works, priced in writing and approved before it is carried out.
Materials and finishes
The terms that matter most for durability, particularly in period property.
- Tanking: the waterproof membrane applied behind tiles in a wet area. Tiles and grout are not waterproof, so this is what actually keeps water out.
- Screed: a levelling layer laid over a floor structure, often containing underfloor heating pipes, on which the final floor finish is laid.
- Lime plaster: the traditional finish on solid walls, which allows the wall to absorb and release moisture. Sealing a lime built wall with cement or gypsum traps damp inside it.
- Damp proof course: a barrier in the wall preventing moisture rising from the ground. Absent or failed in much of the Victorian stock in south west London.
- Decoupling membrane: a layer laid between a timber floor and tiling that allows slight movement without cracking the tiles or the grout.
- Slim profile glazing: double glazed units made thin enough to fit into refurbished sash windows where standard units would not.